routemap Oakland Jack London Square Terminal Alameda Main Street Terminal Alameda Harbor Bay Terminal South San Francisco Terminal AT&T Park Terminal SF Ferry Building Terminal SF Pier 41 Terminal Mare Island Terminal Vallejo Terminal

RFP 17-021: M/V Solano

REQUEST for PROPOSALS


NOTICE IS HEREBY GIVEN THAT PROPOSALS will be received by the San Francisco Bay Area Water Emergency Transportation Authority (hereinafter “WETA”) at Pier 9, Suite 111, San Francisco, CA 94111, until 2:00 p.m. on September 8, 2017 for the following Project: M/V SOLANO, RFP# 17-021. The Work consists of furnishing all engineering and design services, materials, labor, tools, supplies, equipment, transportation, and management necessary for the Work on the Ferry SOLANO as defined by drawings, specifications, and reference documents and materials.

Key Dates (subject to change):

Mandatory Pre-Proposal Conference: 10 August 2017
Last Day to Submit Questions Regarding Contract Documents: 25 August 2017
RFP Proposal Due Date : 8 September 2017
Proposal Evaluation & Scoring: 11 September 2017
Interviews (if necessary): 19 September 2017
Notice of Intent to Award Issued: 27 September 2017
Contract Award: 5 October 2017
See more dates in Instructions to Offerors, Appendix A, Contract Award Schedule.

Download the RFP for M/V Solano RFP #17-021

1 of 4:  Instructions to Offerors (67 pp PDF, 490 KB Download)
2 of 4:  Owner's Requirements (30 pp PDF, 1.3 MB Download)
3 of 4:  General Provisions (80 pp PDF, 533 KB Download)
4 of 4:  Forms in PDF format (45 pp, 585 KB) or in Word (zipped) (45 pp, 493 KB)

Addendum 1: Attendee Sign-in Sheet for the Pre-Proposal Conference held on August 10, 2017; Questions asked to date with responses; Drawing 8700-524-10 – SEA WATER COOLING ARRANGEMENT & DETAILS (8 pp PDF, 1.6 MB)

Addendum 2: Changes, Corrections, and Clarifications; Attachments (21 pp PDF, 165 KB)

Contact:

Keith Stahnke, Operations Manager
(415) 364-3192
Pier 9, Suite 111, The Embarcadero
San Francisco, California 94111

--